Prior to Building
• Plan your budget
• Purchase your land
• Choose a Surveyor
• Hire a Geotech for a Soil Test
REMINDER: One of the first things the home owner needs to do is get a Perk Test in addition to a Soil Report if there’s no city sewer available.
• Find Design Professionals (Architect, Structural/Civil Engineers) or pick a house plan
• Consult the IBC 2006 Residential Building Code
See 06 - Forms, Permits, Regulations
• Prepare Drawings, General Notes, Specs and Contracts
• Pick a mortgage company
• Obtain a construction loan
• Submit drawings to the City of Pagosa Springs or Archuleta County
• Submit drawings to PLPOA (Pagosa Lakes Property Owner's Association), if applicable
|
Steps of Construction
• Excavation and Utilities
• La Plata Electric and Source Gas tap fees
• Foundation System and required block outs
• First floor and/or wall stick framing
• Roof construction and weather proofing
• Exterior siding and final roofing materials
• Final electrical and plumbing
• Final closure: windows and doors
• Interior wall finish
• Wall, ceiling, floor insulation
• Cabinets, fixtures, appliances
• Counter top granite, tile or other material
• Lighting (Dark Sky Ordinance)
|